The new “Dashgil-2” Terminal is located approximately 70 km south of Baku, near the Alat settlement. The terminal will receive production from the “Umid” field through a 20” multiphase subsea production pipeline. The received product will be separated at the terminal and exported through onshore gas, condensate and produced water pipelines.
The new “Dashgil-2” Terminal will be built next to the existing “Dashgil-1” Terminal and will include one production train (12 mln m³/day of gas and 1,860 m³/day of condensate).
“Dashgil-2” Terminal project scope includes:
New infrastructure
- Administrative buildings,
- Workshop,
- Warehouse,
- Control room.
Process area:
- Slug catcher,
- Separators,
- Storage tanks,
- Open and closed drainage systems,
- Low and high-pressure flare modules,
- Wet gas heating module,
- Metering skids,
- Pig receiver and launchers,
- And other utility systems.
37 km 16" condensate export pipeline,
And tie-ins to 40" gas transport and 6" produced water pipelines built within the Umid-1 Production Acceleration Project.